143 URT Improvements

Expertise

Heavy Highway Structures

Location

Milwaukee County, WI

Client

WisDOT
logo_ZTI_rs

About the Project

Project Summary

As the prime contractor, Zenith Tech (ZTI) is managing the complete reconstruction of I-43 northbound and southbound from Capitol Drive to north of Hampton Avenue in Milwaukee County. This project includes six new bridges, one bridge overlay, a pedestrian box culvert, noise walls, retaining walls, and six sign structures. This project addresses poor bridge and pavement conditions and will improve this six-lane corridor. Work began in 2021 with projected completion scheduled for November 2023.

Project Details

  • Intricate construction and utility staging was required due to the significant reduction in roadway elevation.
  • Due to being built on the grounds of the abandoned Union Refrigerator Transit Company (URT) railyard, the management and reuse of contaminated soils presented a unique challenge. The team worked closely with WDNR to implement mitigation practices and ensure environmental requirements were met.
  • ZTI redesigned most of the temporary storm sewer on the project allowing for easier installation and over $75K in savings to the Wisconsin Department of Transportation (WisDOT).
  • Additional Cost Reduction Incentives (CRI) were presented and executed, resulting in over $200K in savings.

We're Hiring

Find Your Next Career With Us

Zenith Tech (ZTI) provides heavy civil construction services for infrastructure projects throughout the Midwest.
Related Projects
Heavy Highway Structures

Jefferson Street Bridge

Burlington, WI

Read More

Asphalt Paving | Heavy Highway Structures | Milling & Pulverizing

USH 12

Madison, WI

Read More

Heavy Highway Structures

Portage Lake Lift Bridge

Houghton, MI

Read More