Sussex Asphalt Plant

Expertise

Solar/Post-Installation

Location

Sussex, WI

Client

Payne and Dolan
logo_ZTI_rs

About the Project

Zenith Tech managed the ground mounted 386kW, fixed-tilt solar field installation at Payne + Dolan’s K&N asphalt plant. The project began in May 2023 and is scheduled for completion in November 2023. This behind the meter project will offset a portion of the energy generated and utility costs associated with plant and aggregate operations.

Project Details

  • The Solar Field is comprised of (858) 450-Watt Modules and is installed on a south-facing, manmade berm to maximize efficiency and minimize public view.
  • Energy generated is collected through (3) 100kVA inverters and sent back over 1,000 feet via underground cables to the main service. The return on investment for the project is approximately 10 years.
  • Payne + Dolan’s engineering team selected the ground mounted solar field location to avoid and minimize negative environmental impacts.
  • Zenith Tech managed the project and self-performed the 95 driven piles to support the racking.

We're Hiring

Find Your Next Career With Us

Zenith Tech (ZTI) provides heavy civil construction services for infrastructure projects throughout the Midwest.
Related Projects
Civil Engineering & Design | Solar/Post-Installation

Fairway Solar

Fairway, WI

Read More

Land Surveying | Solar/Post-Installation

LaFayette Solar

Elkhorn, WI

Read More